Taney
Cable Stayed Bridge -
Dundrum, Dublin
Benaim was appointed by Graham Construction to carry out the
design for a 110m main span cable-stayed bridge. The bridge
carries twin track light rail. The alternative design uses
precast segmental shell units, infilled with in-situ concrete
and prestressed once erected.
|