The main secant bored piles for the 500m long underpass are
installed, the base slab and roof are complete - the road was opened in July.
3
Dunheved
Bridge, Cornwall
Both halves of the deck have now been demolished and replaced
with a three-span steel composite structure - the road is
now fully open again.
4
Victoria
Square, Belfast
The construction of the massive basement is complete,
on all three levels, using post-tensioned flat slabs to support
both the floors and the perimeter walls.
5
Dubai
LRTS, UAE
Our design of 30 No. three-span segmental railway bridges
and sections of the overground stations is completed
for the Red Line.
6
GE19
Bridge, London
Detailed D&C design for an 84m span steel truss bridge,
carrying twin tracks of the new East London Line over the
Great Eastern Line.
Projects in Design
1
3rd
Karnaphuli Bridge, Bangladesh
Independent checking of a 950m long extradosed highway bridge
in Chittagong that has 200m main spans.
2
Shepherd's
Bush Station, London
Detailed design of a new ticket hall and extended ground
level facilities as part of a major upgrade of this tube station.
3
Dubai
LRTS, UAE
Detailed D&C design of further three-span segmental railway
bridges and sections of the overground stations for the new
Green Line.
4
Stratford City Access Bridges, London
Detailed design and independent checking of four steel bridges carrying highways and footways,
over live railway, including an 80m tied arch.